Note: Inspection officer/Third Party be appointed duty within 1 week from the date of submission by contractor.
Note: Inspection of material will be inspected within 2 week from the date of submission by contractor.
Column Filters
ID | Town Name | Agency Name | Work Name | Xen Name | File | XEN File | Status | Action | Rejected Reason if any | Date | Approved Date |
---|---|---|---|---|---|---|---|---|---|---|---|
394 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2021-03-31 10:14:24-Letter no. 1949 dt. 23.03.2021 Inspection call of 1200 MM RCC Pipe).pdf | Pending For Approval | View Detail | 31/03/2021 | |||
393 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-03-20 14:16:49-Inspection -09 Interlock tilses work Abohar Town.pdf | Pending For Approval | View Detail | 20/03/2020 | |||
392 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-03-20 14:14:36-Inspection -08 Interlock tiles work Abohar Town.pdf | Pending For Approval | View Detail | 20/03/2020 | |||
391 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-03-20 14:11:40-Inspection -07 Interlock tiles work Abohar Town.pdf | Pending For Approval | View Detail | 20/03/2020 | |||
389 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-03-18 06:23:09-Inspection Call -05 Interlock tiles 60 mm Thick.pdf | Pending For Approval | View Detail | 18/03/2020 | |||
388 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-03-18 06:19:13-Inspection Call-10 S.W Pipe -100 mm.pdf | Pending For Approval | View Detail | 18/03/2020 | |||
387 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-02-12 15:46:06-Inspection Call for Man Hole Cover Frames at Faridkot Town.pdf | 2020-02-18 10:28:55-faridkot.jpg | Approved | View Detail | 12/02/2020 | 13.02.2020 | |
386 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-02-12 15:32:43-Inspection Call for Man Hole Cover Frames at Kotkapura Town.pdf | 2020-02-18 10:28:27-kotkpaura.jpg | Approved | View Detail | 12/02/2020 | 13.02.2020 | |
385 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-02-10 14:45:32-Inspection Call for RCC 600 mm dia NP3 pipes at Kotkapura Town 10.02.20.pdf | 2020-02-14 10:01:37-600mminspection.jpg | Approved | View Detail | 10/02/2020 | 12-02-2020 | |
384 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-02-10 14:41:17-Inspection Call for DI 800 mm Dia K7 Class Pipes for Kotkapura Town.pdf | 2020-02-14 09:59:30-New Doc 2020-02-13 12.39.38.pdf | Approved | View Detail | 10/02/2020 | 13-02-2020 | |
383 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-01-31 06:46:20-Inspection call for interlocktiles Abohar Town ( Sunny Industry).pdf | Pending For Approval | View Detail | 31/01/2020 | |||
382 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-01-31 06:43:35-Inspection call for interlocktiles Abohar Town ( Dhillon Engg.).pdf | Pending For Approval | View Detail | 31/01/2020 | |||
381 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2020-01-20 12:41:37-Inspection call for Interlocktiles Abohar Town.pdf | Pending For Approval | View Detail | 20/01/2020 | |||
380 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-01-14 09:05:33-Inspection Call for Interlock Paver Block Tiling at Jaitu Town.15 | 2020-01-21 16:34:09-Jaitu3.jpg | Approved | View Detail | 14/01/2020 | 21.01.2020 | |
379 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-01-14 08:55:10-Inspection Call for 400 mm ID RCC NP3 Pipes.pdf | 2020-01-17 10:24:55-181-182.pdf | Approved | View Detail | 14/01/2020 | 14.01.2020 | |
378 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2020-01-07 13:55:08-Inspection Call for Interlock Paver Block Tiling at Jaitu Town 07.01.2020.pdf | 2020-01-17 10:23:20-150-151.pdf | Approved | View Detail | 07/01/2020 | 14.01.2020 | |
377 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-12-31 06:28:16-Inspection call interlock tiles 29.pdf | Pending For Approval | View Detail | 31/12/2019 | |||
376 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-12-24 04:29:18-Inspection call interlock tiles 28.pdf | Pending For Approval | View Detail | 24/12/2019 | |||
375 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-12-24 04:23:55-Inspection call interlock tiles 27.pdf | Pending For Approval | View Detail | 24/12/2019 | |||
374 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-12-19 12:22:06-Inspection note for S.W Pipe.pdf | Pending For Approval | View Detail | 19/12/2019 | |||
373 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-12-07 09:22:17-Inspection Call for Interlock Paver Block Tiling at Faridkot Town 06.12.19.pdf | 2019-12-07 20:04:19-fdk.jpg | Approved | View Detail | 07/12/2019 | 07.12.2019 | |
372 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-12-07 09:18:46-Inspection Call for Interlock paver block tiling at Jaitu Town 06.12.19.pdf | 2019-12-07 19:59:25-jaitu.jpg | Approved | View Detail | 07/12/2019 | 07.12.2019 | |
371 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-12-04 09:17:03-Inspection Call for RCC 600 mm dia NP3 pipes at Kotkapura Town.59 | 2019-12-06 13:31:34-jugal kishor.jpg | Approved | View Detail | 04/12/2019 | 05-12-2019 | |
370 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-11-29 05:03:59-162.pdf | 2019-12-11 16:37:34-Inspection Letter No.162.jpg | Approved | View Detail | 29/11/2019 | 06-12-2019 | |
369 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-11-26 07:50:02-Inspection Call for Interlock Paver Block Tiling at Jaitu Town 26.11.2019.pdf | 2019-12-05 12:23:20-New Doc 2019-12-05 12.27.54.pdf | Approved | View Detail | 26/11/2019 | 28.11.2019 | |
368 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-11-21 11:59:43-Inspection Call for Interlock Paver Block Tiling at Jaitu Town 19.11.2019.pdf | 2019-11-26 10:12:35-New Doc 2019-11-26 10.16.13.pdf | Approved | View Detail | 21/11/2019 | 22.11.2019 | |
367 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-11-13 12:05:52-Inspection Call of LT Panels for 8MLD STP Zone-I at Kotkapura.pdf | 2019-11-16 10:23:43-8MLD KKK.pdf | Approved | View Detail | 13/11/2019 | 14.11.2019 | |
366 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-11-13 12:01:16-Inspection Call of LT Panels for 6 MLD STP Zone-II at Kotkapura.pdf | 2019-11-16 10:40:18-6MLD STP KKK.pdf | Approved | View Detail | 13/11/2019 | 14.11.2019 | |
365 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-11-13 07:23:51-Inspection call PVC Step.pdf | Pending For Approval | View Detail | 13/11/2019 | |||
364 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing and Laying of W/S, Dismantling of Roads, Water Supply House connections and Restoration of Roads at Abohar Town Distt. Fazilka, Punjab Phase –II (under Amrut) | Sh. Jugal Kishor | 2019-11-13 07:20:08-Inspection call Interlocking paver block M-35.pdf | Pending For Approval | View Detail | 13/11/2019 | |||
363 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-11-09 15:51:47-Inspection Call for Interlock Paver Block Tiling at Kotkapura Town 07.11.19.pdf | 2019-11-16 10:18:26-Interlock KKK.pdf | Approved | View Detail | 09/11/2019 | 14.11.2019 | |
362 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-11-09 15:40:04-Inspection Call for Interlock Paver Block Tiling at Faridkot Town 07.11.2019.pdf | 2019-11-16 10:13:39-Inter Lock Tile FDK.pdf | Approved | View Detail | 09/11/2019 | 14.11.2019 | |
361 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-10-14 06:05:00-141 - Interlock Jindal.pdf | 2019-10-31 15:53:22-M35.pdf | Approved | View Detail | 14/10/2019 | 17-10-2019 | |
360 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-10-14 06:02:02-142 - 200 dia Sorkhi.pdf | 2019-11-27 09:52:39-New Doc 2019-11-27 09.57.22.jpg | Approved | View Detail | 14/10/2019 | 01/11/2019 | |
359 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-10-14 05:57:39-140 - DI Fittings.pdf | 2019-10-31 15:51:40-kutty road.pdf | Approved | View Detail | 14/10/2019 | 17-10-2019 | |
358 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-10-01 15:28:07-Interlock Paver Block at Kotkapura Town JINDAL CEMENT PIPE FACTORY.pdf | 2019-10-05 14:41:38-fdk gsw.pdf | Approved | View Detail | 01/10/2019 | 04.10.2019 | |
356 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-10-01 15:23:07-100 mm & 200 mm dia SW Pipe at Kotkapura Basant Vijay Industries.pdf | 2019-10-05 14:38:34-kkp gsw.pdf | Approved | View Detail | 01/10/2019 | 04.10.2019 | |
355 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-10-01 15:16:16-200 mm dia SW Pipe at Faridkot Town Shri Sunrise Ceramics Company .pdf | 2019-10-05 14:43:06-kkp il.pdf | Approved | View Detail | 01/10/2019 | 04.10.2019 | |
354 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-10-01 15:09:17-Interlock Paver Block at Faridkot Town SATYA TILES & CEMENT PRODUCTS.pdf | 2019-10-05 14:37:05-fdk il.pdf | Approved | View Detail | 01/10/2019 | 04.10.2019 | |
353 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2019-09-24 11:08:03-Letter no. 1499 Inspection call for EOT Crane 3T.pdf | Pending For Approval | View Detail | 24/09/2019 | |||
352 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-09-17 13:08:54-Inspection call for DI Pipe 17.09.2019.pdf | 2019-09-26 11:47:46-k7 pipes for sew rites.jpg | Approved | View Detail | 17/09/2019 | 26-9-2019 | |
351 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-09-17 12:57:15-Inspection Call for SW Pipe -08.pdf | 2019-09-26 11:46:29-23.jpg | Approved | View Detail | 17/09/2019 | 6349 | |
350 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-09-17 12:53:49-Inspection Call for SW Pipe -07.pdf | 2019-09-26 11:45:17-22.jpg | Approved | View Detail | 17/09/2019 | 25-9-2019 | |
349 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-09-16 16:09:34-Interlock Paver Block Tiling at Kotkapura Town.pdf | 2019-09-18 16:56:32-Paver block tiling.jpg | Approved | View Detail | 16/09/2019 | 18.09.2019 | |
348 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-09-05 05:53:52-Inspection call for interlocking Tiles-04..45_1 | 2019-09-26 12:17:08-6127.jpg | Approved | View Detail | 05/09/2019 | 6127 | |
346 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2019-09-02 10:05:13-Letter no. 1459 CHLORINE TONNER 5 MGD WTP, Growth centre..pdf | Pending For Approval | View Detail | 02/09/2019 | |||
345 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2019-09-02 09:58:19-Letter no. 1458 CHLORINE TONNER 4.5MLD STP, Adarsh Nagar.pdf | Pending For Approval | View Detail | 02/09/2019 | |||
344 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-08-23 12:16:26-Inspection call for interlock tiles.pdf | 2019-09-05 18:28:46-interlocking m-35 ashok.jpg | Approved | View Detail | 23/08/2019 | 27.8.2019 | |
342 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-08-07 05:55:46-Inspection Call for Interlock tiling at Kotkapura Town.pdf | 2019-08-10 09:53:01-20190810_095430.jpg | Approved | View Detail | 07/08/2019 | 09.08.2019 | |
340 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-08-07 05:49:59-Inspection Call for Interlock Tiling at Faridkot Town.pdf | 2019-08-10 09:53:00-20190810_095426.jpg | Approved | View Detail | 07/08/2019 | 09.08.2019 | |
338 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-07-22 13:32:17-Inspection Call for Interlock Paver Block Tiling at Jaitu Town.pdf | 2019-07-29 16:52:15-Jaitu.jpg | Approved | View Detail | 22/07/2019 | 26.07.2019 | |
337 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-07-22 05:56:45-Inspection Call for 400 mm ID RCC NP3 Pipes..pdf | 2019-07-29 16:53:45-400 mm ID RCC.jpg | Approved | View Detail | 22/07/2019 | 26.07.2019 | |
336 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-07-22 05:52:53-Inspection Call for Interlock Paver Block Tiling at Kotkapura Town.pdf | 2019-07-29 16:51:31-Kotkpura.jpg | Approved | View Detail | 22/07/2019 | 26.07.2019 | |
335 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-07-18 09:08:38-Inspection Call for Interlock Paver Block Tiling at Faridkot Town 17.07.19.pdf | 2019-07-29 16:46:42-pever interlocking.jpg | Approved | View Detail | 18/07/2019 | 26.07.2019 | |
333 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-07-18 04:09:50-interlock inspection Shree balaji-17.07.2019.pdf | 2019-09-05 18:26:17-interlocking m-35 ashok.jpg | Approved | View Detail | 18/07/2019 | 27.8.2019 | |
332 | Jagraon | M/s Kulwant Singh Sandhu | Cons of OHSR 1.5 Lac Glns capacity at jagraon | Sh. Gurdeesh Pal Singh | 2019-07-15 05:40:38-ohsr spls insp letter.pdf | Pending For Approval | View Detail | 15/07/2019 | |||
330 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-07-13 09:23:39-Inspection of 600mm dia RCC NP3 Pipe, Faridkot Town.pdf | 2019-07-18 09:37:51-IMG-20190718-WA0002 (1).jpg | Approved | View Detail | 14/07/2019 | 17.07.2019 | |
329 | Khanna | 21st centuary enviro infra ltd | Const. of STP (Under AMRUT) | Sh. Gurdeesh Pal Singh | 2019-07-10 13:32:31-INSPECTION CALL.pdf | Pending For Approval | View Detail | 11/07/2019 | |||
328 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-07-05 05:24:37-Inspection Call for 600mm dia RCC NP3 Pipe_1.pdf | 2019-07-09 17:55:19-pipes at Kotkapura.pdf | Approved | View Detail | 05/07/2019 | 08-07-2019 | |
327 | Sri Hargobindpur | M/S Rajan Builders | Const of OHSR 0.5 Lac gln at Shri Hargobindpur | Sh. Satnam Singh | 2019-06-28 07:47:10-letter 28-6-2019.pdf | Pending For Approval | View Detail | 28/06/2019 | |||
326 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing Laying Water Supply & const. of WTP | Sh. Jugal Kishor | 2019-06-25 12:32:23-Water supply fittings inspection note.pdf | 2019-07-17 19:23:31-water supply fitting_1.jpg | Approved | View Detail | 25/06/2019 | 17-7-2019 | |
325 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-06-25 12:26:24-SW Pipe Inspeciton Note.pdf | 2019-07-17 19:25:29-100 dn sw 4_1.jpg | Approved | View Detail | 25/06/2019 | 17-7-2019 | |
324 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-06-25 03:40:41- | Pending For Approval | View Detail | 25/06/2019 | |||
321 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-06-20 07:11:18-Sunny Ind.pdf | 2019-06-25 15:37:02-4238-39.jpg | Approved | View Detail | 20/06/2019 | 21.06.2019 | |
320 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-06-20 07:06:45-DI Pipe Inspection.pdf | 2019-06-25 15:11:21-4261.jpg | Approved | View Detail | 20/06/2019 | 21.6.19 | |
319 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-06-20 07:00:32-Inspection MDPE Pipes.pdf | 2019-06-25 14:57:59-4235-36.jpg | Approved | View Detail | 20/06/2019 | 21.06.2019 | |
318 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-06-19 16:26:02-Transformer 6MLD and 8 MLD_20190619213109.pdf | 2019-07-09 17:45:01-250 KVA transformer for 6 mld stp.pdf | Approved | View Detail | 19/06/2019 | 26-06-2019 | |
317 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-06-19 16:18:35-CCT outlet pump_20190619213248.pdf | 2019-07-09 17:50:59-pump for 6 mld stp jaitu (1).pdf | Approved | View Detail | 19/06/2019 | 26/06/2019 | |
316 | Gidderbaha | Sh. Nem Kumar Bansal Contractor Bathinda | Providing Water Supply & Sewerage System, rising main, water works Gidderbaha | Sh. Gurvinder Pal Singh | 2019-05-16 08:30:57-Image.jpg | Pending For Approval | View Detail | 16/05/2019 | |||
315 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-05-13 07:30:31-600 dia inspection.pdf | 2019-06-11 10:14:34-11.06.19.jpg | Approved | View Detail | 13/05/2019 | 06.06.2019 | |
314 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-05-08 06:58:27-CI Sluice Gates.pdf | 2019-05-09 14:05:44- | Approved | View Detail | 08/05/2019 | 07.05.19 | |
313 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing Laying Water Supply & const. of WTP | Sh. Jugal Kishor | 2019-05-01 14:17:26-MDPE Pipe Inspection call.pdf | 2019-05-09 17:54:49-MDPE.jpg | Approved | View Detail | 01/05/2019 | 3224 | |
312 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 09:04:01-RCC 600 mm dia NP3 Pipes at Faridkot Town.pdf | 2019-04-30 11:07:58-2929-30.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
311 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:59:51-Interlock Paver Block Tiling at Kotkapura Town.pdf | 2019-04-30 11:06:52-2926-27.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
310 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:44:59-Interlock Paver Block Tiling at Jaitu Town.pdf | 2019-04-30 11:05:15-2923-24.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
309 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:40:39-Interlock paver block tiling at Faridkot Town.pdf | 2019-04-30 11:02:42-2932-33.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
308 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:35:49-GSW 100mm, 200mm & 250 mm dia Pipes at Faridkot Town.pdf | 2019-04-30 11:00:25-2920-21.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
307 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:30:33-GSW 400 mm dia Pipes at Kotkapura Town.pdf | 2019-04-30 10:58:54-2908-09.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
306 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:25:04-GSW 400 mm dia Pipes at Jaitu Town.pdf | 2019-04-30 10:57:51-2902-03.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
305 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:19:55-GSW 400 mm dia Pipes at Faridkot Town.pdf | 2019-04-30 10:56:48-2905-06.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
304 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:15:32-Man Hole Cover Frames & PVC Foot Rest at Kotkapura Town.pdf | 2019-04-30 16:07:08-New Doc 2019-04-30 16.04.22_1 (3).pdf | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
303 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:08:21-Man Hole Cover Frames & PVC Foot Rest at Jaitu Town.pdf | 2019-04-30 10:52:13-2914-15.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
302 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 08:02:29-Man Hole Cover Frames & PVC Foot Rest at Faridkot Town.pdf | 2019-04-30 10:50:07-2917-18.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
301 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 06:58:17-GSW 100, 200 & 300 mm dia Pipes at Kotkapura Town.pdf | 2019-04-30 10:48:22-2935-36.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
300 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-25 06:49:24-GSW 100 & 200 mm dia Pipes at Jaitu Town.pdf | 2019-04-30 10:46:06-2937.jpg | Approved | View Detail | 25/04/2019 | 29.04.2019 | |
299 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-04-24 07:18:15-Tile Inspection.pdf | 2019-06-21 19:43:52- | Approved | View Detail | 24/04/2019 | 09/05/2019 | |
298 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-04-24 07:09:55-Pump Inspection.pdf | 2019-05-01 16:36:49-84 dt.15.4.19.jpeg | Approved | View Detail | 24/04/2019 | 30.4.2019 | |
297 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-04-24 07:07:22-400 dia inspection.pdf | 2019-05-01 16:43:22-85 dt.15.4.19.jpeg | Approved | View Detail | 24/04/2019 | 30.4.19 | |
296 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing Laying Water Supply & const. of WTP | Sh. Jugal Kishor | 2019-04-24 05:33:13-190424113905_0001.pdf | 2019-05-09 17:52:31-Water.jpg | Approved | View Detail | 24/04/2019 | 3020 | |
295 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-04-22 15:09:49-INTERLOCKING TILES for Faridkot Town (SHIV SHAKTI ).pdf | 2019-04-24 09:56:51-IMG-20190418-WA0048.jpg | Approved | View Detail | 22/04/2019 | 18.04-2019 | |
293 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-04-08 10:33:48-Basant Vijay Inspectioon 200, 250, 300.pdf | 2019-04-18 11:34:21-18.4.19.jpg | Approved | View Detail | 08/04/2019 | 10/04/2019 | |
292 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-04-03 10:44:18-600 dia.pdf | 2019-04-08 10:42:25-73.jpg | Approved | View Detail | 03/04/2019 | 03/04/2019 | |
291 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-04-03 10:39:24-Di Fittings.pdf | 2019-04-04 12:31:49-72.pdf | Approved | View Detail | 03/04/2019 | 3/4/2019 | |
283 | Bathinda | M/S Vijay Engineering Works Patiala | Prov and O&m of W/S and sew Bathinda town | Sh. Ashwani Kumar | 2019-03-13 14:18:13-performa sw.pdf | 2019-06-19 14:42:23- | Approved | View Detail | 13/03/2019 | 18-04-2019 | |
282 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-12 06:26:50-800 mm dia DI Pipe Inspection letter for Faridkot Town.pdf | 2019-03-16 12:09:05-dik7.jpg | Approved | View Detail | 12/03/2019 | 16.03.2019 | |
281 | Gidderbaha | Sh. Nem Kumar Bansal Contractor Bathinda | Providing Water Supply & Sewerage System, rising main, water works Gidderbaha | Sh. Gurvinder Pal Singh | 2019-03-11 08:00:12-inspection note.pdf | 2019-04-19 14:10:13- | Approved | View Detail | 11/03/2019 | 15.03.2019 | |
280 | Bathinda | M/S Vijay Engineering Works Patiala | Prov and O&m of W/S and sew Bathinda town | Sh. Ashwani Kumar | 2019-03-11 07:48:07-performa mh cover.pdf | 2019-04-18 10:21:48- | Approved | View Detail | 11/03/2019 | 10-04-2019 | |
279 | Bathinda | M/S Vijay Engineering Works Patiala | Prov and O&m of W/S and sew Bathinda town | Sh. Ashwani Kumar | 2019-03-11 07:45:46-performa sw pipe.pdf | 2019-04-18 10:15:53- | Approved | View Detail | 11/03/2019 | 10-04-2019 | |
278 | Bathinda | M/S Vijay Engineering Works Patiala | Prov and O&m of W/S and sew Bathinda town | Sh. Ashwani Kumar | 2019-03-11 07:21:50-PERFORMA DI PIPES.pdf | 2019-04-18 10:09:47- | Approved | View Detail | 11/03/2019 | 11-03-2019 | |
275 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-09 06:09:06-Inspection letter of SW Pipe at Jaitu Town.pdf | 2019-03-16 12:10:24-JATUPOLE.jpg | Approved | View Detail | 09/03/2019 | 15.03.2019 | |
274 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-09 06:02:31-Inspection letter of electric pole at 6 MLD JTU.pdf | 2019-03-16 12:12:24-JATUPOLE.jpg | Approved | View Detail | 09/03/2019 | 15.03.2019 | |
273 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-09 05:59:48-Inspection letter of electric pole at 6 MLD KKP.pdf | 2019-03-16 12:11:31-6MLDKKPPOLE.jpg | Approved | View Detail | 09/03/2019 | 15.03.2019 | |
272 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-09 05:57:07-Inspection letter of electrical pole at 8 MLD KKP.pdf | 2019-03-16 12:13:39-8MLDKKPPOLE.jpg | Approved | View Detail | 09/03/2019 | 15.03.2019 | |
271 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-08 06:47:37-Valves List 6 MLD STP JTU.pdf | 2019-03-11 11:29:37-6mld jtu.jpg | Approved | View Detail | 08/03/2019 | 08.03.2019 | |
270 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-08 06:44:37-Valves List 8 MLD STP KKP.pdf | 2019-03-11 11:29:02-8mldkkp.jpg | Approved | View Detail | 08/03/2019 | 08.03.2019 | |
269 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-08 06:40:10-Valves List 6 MLD STP KKP.pdf | 2019-03-11 11:28:10-6mld kkp.jpg | Approved | View Detail | 08/03/2019 | 08.03.2019 | |
265 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-03-05 14:43:14-Pal Ceramics.pdf | 2019-04-08 16:01:03-69.jpg | Approved | View Detail | 05/03/2019 | 3/4/2019 | |
264 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-03-05 14:35:05-Rajasthan pipes.pdf | 2019-04-08 16:00:08-70.jpg | Approved | View Detail | 05/03/2019 | 03/04/2019 | |
263 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-01 05:34:12-letter no 157.pdf | 2019-03-06 17:48:48-IMG-20190306-WA0037.jpg | Approved | View Detail | 01/03/2019 | 06.03.2019 | |
262 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-03-01 05:27:12-letter no 156.pdf | 2019-03-06 17:47:24-IMG-20190306-WA0036.jpg | Approved | View Detail | 01/03/2019 | 06.03.2019 | |
261 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-02-28 06:17:08-Inspection call for interlocking paver block.pdf | 2019-04-18 17:45:20-Interlocking paver.jpg | Approved | View Detail | 28/02/2019 | 18-03-2019 | |
260 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing Laying Water Supply & const. of WTP | Sh. Jugal Kishor | 2019-02-28 06:10:51-inspection of DI fitting for water supply.pdf | 2019-03-07 15:48:56-DI Fittings.jpeg | Approved | View Detail | 28/02/2019 | 06-03-2019 | |
259 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-02-24 15:23:56-400 dia Inspectiom.pdf | 2019-03-27 16:36:07-Inspection 60.jpg | Approved | View Detail | 24/02/2019 | 26/03/2019 | |
258 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2019-02-22 05:43:34-Inspection Call for Interlock Paver Block Tiling at Jaitu Town.pdf | 2019-02-27 09:39:52-inspection1.jpg | Approved | View Detail | 22/02/2019 | 25.02.2019 | |
257 | Gidderbaha | Sh. Nem Kumar Bansal Contractor Bathinda | Providing Water Supply & Sewerage System, rising main, water works Gidderbaha | Sh. Gurvinder Pal Singh | 2019-02-20 10:46:52-New Doc 2019-02-14 17.32.19 | 2019-02-20 16:24:46-New Doc 2019-02-14 17.32.19 | Approved | View Detail | 20/02/2019 | 508 | |
252 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2019-02-20 05:37:02-Lab equipemt.pdf | 2019-03-27 16:33:12-GSJ inspection.jpg | Approved | View Detail | 20/02/2019 | 28/02/2019 | |
251 | Gidderbaha | Sh. Nem Kumar Bansal Contractor Bathinda | Providing Water Supply & Sewerage System, rising main, water works Gidderbaha | Sh. Gurvinder Pal Singh | 2019-02-20 05:28:44-New Doc 2019-02-14 17.32.19 | 2019-02-20 11:32:19-New Doc 2019-02-14 17.32.19 | Approved | View Detail | 20/02/2019 | 508 | |
250 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-02-19 07:44:04-Interlock Tiles.pdf | 2019-02-26 16:08:16-ins.jpg | Approved | View Detail | 19/02/2019 | 25/02/2019 | |
249 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing Laying Water Supply & const. of WTP | Sh. Jugal Kishor | 2019-02-18 05:00:21-Sluice valve inspection call.jpg | 2019-02-25 12:26:17-sluice valve rites.jpg | Approved | View Detail | 18/02/2019 | 06-02-2019 | |
247 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-02-18 04:32:55-Rajasthan pipe_100 mm dia.jpg | 2019-02-25 12:49:28-100mm pipe 3.jpg | Approved | View Detail | 18/02/2019 | 28.1.2019 | |
246 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-02-18 04:22:28-Pal ceramic_100 mm dia sw pipe.jpg | 2019-02-25 12:45:24-100mm pipe 2.jpg | Approved | View Detail | 17/02/2019 | 28-01-2019 | |
243 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-02-17 11:38:42-200 dia.pdf | 2019-04-02 16:20:59-39.jpg | Approved | View Detail | 17/02/2019 | 4/10/2018 | |
242 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-02-17 11:37:41-200 dia sorkhi.pdf | 2019-04-02 16:24:35-37.jpg | Approved | View Detail | 17/02/2019 | 4.10.2018 | |
241 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh. Jugal Kishor | 2019-02-17 11:33:01-WhatsApp Image 2019-02-15 at 7.24.51 PM.jpeg | 2019-02-27 16:12:47-MH Cover Frame duty.jpg | Approved | View Detail | 17/02/2019 | 25-02-2019 | |
240 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-02-16 05:29:59-Call for Paver Block (K.L.Contractor)-16.02.19.pdf | 2019-04-18 11:01:14- | Approved | View Detail | 16/02/2019 | 26-03-2019 | |
239 | Bhikhi | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-02-16 05:22:49-Call for Paver Block (K.L.Contractor)-16.02.19.pdf | 2019-04-18 11:00:52- | Approved | View Detail | 16/02/2019 | 26-03-2019 | |
238 | Bareta | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-02-16 04:59:20-Call for Paver Block (K.L.Contractor)-16.02.19.pdf | 2019-04-18 11:00:22- | Approved | View Detail | 16/02/2019 | 26-03-2019 | |
237 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2019-02-15 10:08:46-400 dia Inspectiom.pdf | 2019-03-27 16:30:12-Inspection 60.jpg | Approved | View Detail | 15/02/2019 | 26/03/2019 | |
236 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-01-29 08:28:06-Inspection call for Manhole Cover & Frame-29.01.19.pdf | 2019-04-02 13:31:39- | Approved | View Detail | 29/01/2019 | 11.03.2019 | |
235 | Sardulgarh | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-01-29 08:23:33-Inspection call for Manhole Cover & Frame-29.01.19.pdf | 2019-04-02 13:30:34- | Approved | View Detail | 29/01/2019 | 11.03.2019 | |
234 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-01-29 05:30:38-Inspection call and performa of Paver Block (Baba Sahib Dass)-29.01.19.pdf | 2019-04-02 13:29:56- | Approved | View Detail | 29/01/2019 | 26.03.2019 | |
233 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2019-01-29 05:12:50-Inspection call and performa of Paver Block (Baba Sahib Dass)-29.01.19.pdf | 2019-04-02 13:29:23- | Approved | View Detail | 29/01/2019 | 26.03.2019 | |
232 | Gidderbaha | Sh. Nem Kumar Bansal Contractor Bathinda | Providing Water Supply & Sewerage System, rising main, water works Gidderbaha | Sh. Gurvinder Pal Singh | 2019-01-11 09:21:29-IMG-20190109-WA0015.jpg | 2019-02-20 11:41:48-Full page photo.pdf | Approved | View Detail | 11/01/2019 | 109 | |
231 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2019-01-10 11:39:07-Letter no. 1240 Various types of motors for 5 MGD & Growth Center WTP.pdf | Pending For Approval | View Detail | 10/01/2019 | |||
230 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2019-01-10 11:14:56-Letter no. 1238 Inspection call Chlorination System, for 5 MGD WTP.pdf | 2019-04-19 14:03:02- | Approved | View Detail | 10/01/2019 | 28.02.2019 | |
229 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2019-01-10 06:41:43-Letter no. 1239 Inspection call 250 KVA Transformer, for 4.5 MLD STP.pdf | 2019-04-18 10:09:06- | Approved | View Detail | 10/01/2019 | 22-02-2019 | |
228 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2019-01-10 06:33:36-Letter no. 1241 Inspection call Air Blower Motor, for 4.5 MLD STP.pdf | 2019-04-18 10:08:09- | Approved | View Detail | 10/01/2019 | 31-01-2019 | |
227 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2019-01-10 06:25:36-Letter no. 1237 Inspection call Chlorination System, for 4.5 MLD STP.pdf | 2019-04-18 10:07:34- | Approved | View Detail | 10/01/2019 | 31-01-2019 | |
225 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-12-20 06:53:30-150 & 200 rcc pipe 6 mld stp jaitu.pdf | 2019-02-01 14:12:36-IMG-20190201-WA0030.jpg | Approved | View Detail | 20/12/2018 | 20.12.2018 | |
224 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-12-20 06:51:32-150 & 200 rcc pipe 6 mld stp kotkapura.pdf | 2019-02-01 14:13:14-IMG-20190201-WA0033.jpg | Approved | View Detail | 20/12/2018 | 20.12.2018 | |
223 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-12-20 06:48:26-150& 200 rcc pipe 8 mld stp kotkapura.pdf | 2019-02-01 14:11:50-IMG-20190201-WA0032.jpg | Approved | View Detail | 20/12/2018 | 20.12.2018 | |
222 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-12-20 06:36:03-150 mm rcc pipe jait town.pdf | 2019-02-01 14:11:00-IMG-20190201-WA0029.jpg | Approved | View Detail | 20/12/2018 | 20.12.2018 | |
221 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-12-20 06:34:02-150 mm rcc pipe faridkot town.pdf | 2019-02-01 14:09:19-IMG-20190201-WA0031.jpg | Approved | View Detail | 20/12/2018 | 20.12.2018 | |
220 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-12-20 06:30:15-150 mm rcc pipe kotkapura town.pdf | 2019-02-01 14:08:10-IMG-20190201-WA0028.jpg | Approved | View Detail | 20/12/2018 | 20.12.2018 | |
218 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-12-14 06:13:35-Inspection call of Paver Block (Baba Sahib)-14.12.18.pdf | 2019-01-01 16:52:15- | Approved | View Detail | 14/12/2018 | 20-12-2018 | |
217 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-12-14 06:00:07-Inspection call of Paver Block (Baba Sahib)-14.12.18.pdf | 2019-01-01 16:50:04- | Approved | View Detail | 14/12/2018 | 20-12-2018 | |
216 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-12-12 11:08:51-Inspection call for LT motor.pdf | 2019-01-01 16:48:12- | Approved | View Detail | 12/12/2018 | 20-12-2018 | |
215 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-12-07 05:24:49-Inspection call of 150dia RCC Pipe-new malwa.pdf | 2019-01-01 16:46:06- | Approved | View Detail | 07/12/2018 | 20-12-2018 | |
214 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2018-11-28 05:10:09-Letter no. 1174 Various dia MS Steel Tubes for 5 MGD WTP at Growth Centre.pdf | Pending For Approval | View Detail | 28/11/2018 | |||
213 | Khanna | 21st centuary enviro infra ltd | Const. of STP (Under AMRUT) | Sh. Gurdeesh Pal Singh | 2018-11-27 09:36:47-Inspection for RCC Pipe NP-3.pdf | Pending For Approval | View Detail | 27/11/2018 | |||
212 | Khanna | 21st centuary enviro infra ltd | Const. of STP (Under AMRUT) | Sh. Gurdeesh Pal Singh | 2018-11-27 09:30:55-inspection request.pdf | Pending For Approval | View Detail | 27/11/2018 | |||
211 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-11-20 10:21:01-Inspection call of Paver Block(Krishanlal)-20.11.18.pdf | 2018-11-29 16:36:21- | Approved | View Detail | 20/11/2018 | 22-11-2018 | |
210 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-11-20 09:37:01-Inspection call of Paver Block (Sri Ganesh)-19.11.18.pdf | 2019-01-01 13:11:01- | Approved | View Detail | 20/11/2018 | 07.12.2018 | |
209 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-11-19 11:10:08-Inspection call of Paver Block (Malwa Industries)-19.11.18.pdf | 2019-01-01 13:07:51- | Approved | View Detail | 19/11/2018 | 07.12.2018 | |
208 | Moga | M/S GSJ Envo Ltd. | Ext and Aug sew scheme makkhu | Sh. Parul Goyal | 2018-11-14 08:58:41-IMG-20181114-WA0008.jpg | Rejected by XEN | View Detail | inspection performa not filled correctly. | 14/11/2018 | ||
207 | Moga | M/S GSJ Envo Ltd. | Ext and Aug sew scheme makkhu | Sh. Parul Goyal | 2018-11-14 08:56:55-IMG-20181114-WA0009.jpg | Rejected by XEN | View Detail | inspection performa not filled correctly. | 14/11/2018 | ||
206 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-11-14 08:24:22-001.jpg | 2018-11-21 10:08:48-Inspection Sh AK Maini.jpg | Approved | View Detail | 14/11/2018 | 20-11-2018 | |
205 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-11-14 07:17:52-Letter no. 1191 Mechanical Screen for, 4.5 MLD STP Adrsh Nagar.pdf | 2018-12-06 09:59:51-72.jpg | Approved | View Detail | 14/11/2018 | 03-12-2018 | |
204 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-11-12 06:30:59-Proforma for Inspection.jpeg | Rejected by XEN | View Detail | incomp. doc. | 12/11/2018 | ||
203 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2018-11-12 05:14:24-Letter no. 1186 EOT Crane and Hoist, for 5 MGD WTP.pdf | 2019-04-19 14:11:44- | Approved | View Detail | 12/11/2018 | 14.02.2019 | |
202 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-11-12 04:54:26-Letter no. 1185 EOT Crane and Hoist, for 4.5 MLD STP.pdf | 2018-12-06 09:54:58-72.jpg | Approved | View Detail | 12/11/2018 | 03-12-2018 | |
201 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-27 14:20:14-H.T. Panel.pdf | 2018-10-30 09:56:30-HT PANEL.jpg | Approved | View Detail | 27/10/2018 | 29.10.2018 | |
200 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-27 14:16:41-H.T. Panel.pdf | 2018-10-30 09:54:10-HT PANEL.jpg | Approved | View Detail | 27/10/2018 | 29.10.2018 | |
199 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-27 14:12:41-100 dia GSW Pipe.pdf | 2018-10-30 09:50:44-KKP100.jpg | Approved | View Detail | 27/10/2018 | 29.10.2018 | |
198 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-27 14:09:34-400 dia GSW PIPE.pdf | 2018-10-30 09:44:17-kkp400.jpg | Approved | View Detail | 27/10/2018 | 29.10.2018 | |
197 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-10-18 06:37:53-Letter no. 1162 Inspection call RCC P1 1200mm 200Nos. Anand Pipes.pdf | 2018-10-30 14:45:34-eee.jpg | Approved | View Detail | 18/10/2018 | 26-10-2018 | |
196 | Kharar | Sh. Joginder Singh Contractor, Mohali | Providing Water Supply, Sewerage, OHSR, IPS | Sh. Rahul Kaushal | 2018-10-10 06:46:57- | 2018-10-27 12:58:29- | Approved | View Detail | 10/10/2018 | 15-10-2018 | |
195 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-05 04:16:12-6 MLD STP Jaitu Inspection call of VALVES.pdf | 2018-10-10 12:59:49-IMG-20181010-WA0004.jpg | Approved | View Detail | 05/10/2018 | 05.10.2018 | |
194 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-05 04:14:11-8 MLD STP Kotkapura Inspection call of VALVES.pdf | 2018-10-10 12:59:08-IMG-20181010-WA0004.jpg | Approved | View Detail | 05/10/2018 | 05.10.2018 | |
193 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-05 04:11:15-6 MLD STP Kotkapura Inspection call of VALVES.pdf | 2018-10-10 12:57:25- | Approved | View Detail | 05/10/2018 | 05.10.2018 | |
192 | Moga | M/S GSJ Envo Ltd. | Ext and Aug sew scheme makkhu | Sh. Parul Goyal | 2018-10-04 09:34:27-001.jpg | 2018-10-05 09:08:15-2018-10-05 09.38.49.jpg | Approved | View Detail | 04/10/2018 | 04.10.18 | |
191 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-10-04 05:09:23-Inspection Call for Interlock Paver Block Tiling at Faridkot Town.pdf | 2018-10-05 09:04:56-2018-10-05 09.35.00.jpg | Approved | View Detail | 04/10/2018 | 04.10.2018 | |
190 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-09-26 07:53:39-IMG-20180926-WA0000.jpg | 2018-10-08 15:29:54-New Doc 2018-10-08 (39).pdf | Approved | View Detail | 26/09/2018 | 04-10-2018 | |
189 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-09-26 07:51:40-IMG-20180926-WA0001.jpg | 2018-10-08 15:28:26-New( Doc 2018-10-08) 37.pdf | Approved | View Detail | 26/09/2018 | 04-10-2018 | |
188 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-09-24 09:32:42-Letter no. 1144 QAP PLC & Tubular Fine Bubble Air Diffusers for 4.5 MLD STP.pdf | Rejected by XEN | View Detail | As already approved | 24/09/2018 | ||
187 | Lalru | M/s Oberoi Contruction Corporation | providing and laying SW PIPE sewer and construction of MPS at lalru under urban mission project | Ms Lata Chauhan | 2018-09-22 13:04:51-Regarding Inspection of Material at Lalru A.pdf | 2018-10-31 09:16:22-letter of Inspection.jpg | Approved | View Detail | 22/09/2018 | 09/10/2018 | |
186 | Lalru | M/s Oberoi Contruction Corporation | providing and laying SW PIPE sewer and construction of MPS at lalru under urban mission project | Ms Lata Chauhan | 2018-09-22 12:57:09-Regarding Inspection of Material at Lalru B.pdf | 2018-10-31 09:04:56-letter of Inspection.jpg | Approved | View Detail | 22/09/2018 | 09/10/2018 | |
182 | Lalru | M/s Oberoi Contruction Corporation | providing and laying SW PIPE sewer and construction of MPS at lalru under urban mission project | Ms Lata Chauhan | 2018-09-22 12:28:36-Regarding Inspection of Material at Lalru C.pdf | 2018-10-31 09:19:15-letter of Inspection.jpg | Approved | View Detail | 22/09/2018 | 09/10/2018 | |
181 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-09-21 12:00:05-Inspection call glased stone ware pipe 20.09.18.pdf | 2018-09-27 09:37:46- | Approved | View Detail | 21/09/2018 | 21-09-2018 | |
180 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-09-18 09:26:23-WhatsApp Image 2018-09-18 at 3.19.21 PM.jpeg | 2018-09-26 12:25:55-New Doc 2018-09-26 12.53.01_1.jpg | Approved | View Detail | 18/09/2018 | 21-9-2018 | |
179 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh.Pritpal Singh | 2018-09-17 07:48:49-180824155130_0001.pdf | 2018-09-21 13:03:27- | Approved | View Detail | 17/09/2018 | 17/9/18 | |
178 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-09-15 09:39:31-Inspection call and performa of Paver Block (Ganesh Industries).pdf | 2018-09-21 11:40:03- | Approved | View Detail | 15/09/2018 | 18-09-2018 | |
177 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-09-15 09:30:59-Inspection call and performa of Paver Block (Baba Sahib Dass).jpeg.pdf | 2018-09-21 11:35:18- | Approved | View Detail | 15/09/2018 | 18-09-2018 | |
176 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-09-15 09:13:18-Inspection call and of Paver Block (New Malwa Industries).pdf | 2018-09-21 11:29:11- | Approved | View Detail | 15/09/2018 | 18-09-2018 | |
174 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-09-14 09:11:04-gsj01.jpeg | 2018-09-26 12:27:07-New Doc 2018-09-26 12.53.01_2.jpg | Approved | View Detail | 14/09/2018 | 21-9-2018 | |
173 | Moga | M/S GSJ Envo Ltd. | Ext and Aug sew scheme makkhu | Sh. Parul Goyal | 2018-09-13 07:13:00-Photo from DAVINDER SINGH | 2018-09-18 09:54:17-inspection.jpg | Approved | View Detail | 13/09/2018 | 14.09.2018 | |
172 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-08-28 02:45:16-InspReqCentriPumps_RotoPumps.pdf | 2018-09-24 14:48:33- | Approved | View Detail | 28/08/2018 | 21-09-2018 | |
171 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-08-27 08:16:09-Inspection call of Paver Block.jpeg | 2018-09-12 11:08:15- | Approved | View Detail | 27/08/2018 | 31-08-2018 | |
170 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-08-27 07:48:27-002.jpg | 2018-08-28 18:02:55- | Approved | View Detail | 27/08/2018 | 28-08-2018 | |
169 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-08-25 07:08:41-letter no 69.pdf | 2018-08-30 09:03:38-inspection.jpg | Approved | View Detail | 25/08/2018 | 28.08.2018 | |
168 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-08-23 11:05:06-003.jpg | 2018-08-28 18:01:58- | Approved | View Detail | 23/08/2018 | 28-08-2018 | |
167 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-08-23 11:00:32-001.jpg | 2018-08-28 18:00:30- | Approved | View Detail | 23/08/2018 | 28-08-2018 | |
166 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-08-20 10:41:44-Letter no. 1106 Inspection call for Centrifuge, for 4.5 MLD STP.pdf | 2018-08-27 12:48:28- | Approved | View Detail | 20/08/2018 | 27-08-2018 | |
165 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2018-08-20 10:21:43-Letter no. 1072 Inspection call for Power Cables, for 5 MGD WTP.pdf | 2018-08-28 19:01:49- | Approved | View Detail | 20/08/2018 | 27/08/2018 | |
164 | Arniwala | M/s. Shapoorji Pallonji Co. Ltd | Providing laying sewerage work and const of STP | Sh.Pritpal Singh | 2018-08-18 06:47:56-Manhole Cover Inspection.pdf | 2018-08-28 10:03:54-MH Arniwala.jpg | Approved | View Detail | 18/08/2018 | 24.8.2018 | |
162 | Arniwala | M/s. Shapoorji Pallonji Co. Ltd | Providing laying sewerage work and const of STP | Sh.Pritpal Singh | 2018-08-18 05:12:51-DI Pipe Inspection.pdf | 2018-08-28 11:46:45-DI Arniwala.jpg | Approved | View Detail | 18/08/2018 | 24/8/18 | |
161 | Arniwala | M/s. Shapoorji Pallonji Co. Ltd | Providing laying water supply & construction of OHSR and WTP | Sh.Pritpal Singh | 2018-08-18 05:10:49-DI Pipe Inspection.pdf | 2018-08-28 09:54:58-DI Arniwala.jpg | Approved | View Detail | 18/08/2018 | 24/08/2018 | |
157 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-08-17 05:29:06-inspection letter of SW Pipe.pdf | 2018-08-25 09:28:25- | Approved | View Detail | 17/08/2018 | 23-08-2018 | |
155 | Bassi Pathana | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-08-17 04:54:23-inspection letter of RCC Pipe.pdf | 2018-08-25 09:27:39- | Approved | View Detail | 17/08/2018 | 23-08-2018 | |
153 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-08-10 10:58:15-Letter no. 1097 HT VCB PANEL, for 4.5 MLD STP.pdf | Rejected by XEN | View Detail | returned back to the firm for submission of time schedule and when the material is actually required at site. Vide EE PWSSD No.1 Bathinda Letter NO.2999 dated 16-08-18 | 10/08/2018 | ||
152 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-08-10 10:33:04-Letter no. 1096.pdf | 2018-08-27 12:41:38- | Approved | View Detail | 10/08/2018 | 27-08-2018 | |
151 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-08-10 05:36:09-Letter no. 1090 Dt. 09.08.2018 Inspection call RCC P1 1200mm.pdf | Approved | View Detail | 10/08/2018 | 21-08-2018 | ||
150 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-08-10 05:35:15-Inspection call for ele.Pole.pdf | 2018-08-25 09:23:49- | Approved | View Detail | 10/08/2018 | 23-08-2018 | |
148 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-08-09 14:10:17-Sub. Pump Inspection.pdf | Rejected by XEN | View Detail | refer back to agency with this office letter no 3469 dated 28/8/18 | 09/08/2018 | ||
147 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-08-06 08:07:34-600 dia inspection.jpeg | Approved | View Detail | 06/08/2018 | 10/08/18 | ||
146 | Adampur | M/s S.R. Builders & Exporters, Patiala | Const. of MPS | Sh. Jitin Vasudeva | 2018-08-03 10:21:27-Inspection of Aluminium Frame (2.8.18).pdf | Approved | View Detail | 03/08/2018 | 03082018 | ||
145 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-08-02 10:31:52-InspReqChlorinationSyst.pdf | Approved | View Detail | 02/08/2018 | 10-08-2018 | ||
143 | Mehatpur | M/s Kulwant Singh Sandhu | Const. of OHSR | Sh. Jitin Vasudeva | 2018-07-31 06:53:16-IMG_0001.pdf | 2018-11-13 10:44:50-InspectionLetter.jpeg | Approved | View Detail | 31/07/2018 | 07-09-2018 | |
142 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-07-27 06:54:04-Letter no. 1069 Inspection call for 250 KVA DG Set, for 4.5 MLD STP.pdf | Rejected by XEN | View Detail | 250 KVA DG set is required after completion of civil work of 4.5 MLD STP and up till now only 15% work has been completed by the firm and further progress is very slow so DG set is required after completion of construction work of STP | 27/07/2018 | ||
141 | Ferozepur | Sh. Arunesh Gupta Contractor Panchkula | Providing Water Supply work (Under AMRUT) | Sh.Pritpal Singh | 2018-07-27 05:39:07-ag.pdf | Rejected by XEN | View Detail | Refer back vide Sub Divisional Engineer, Pb. W/S | 27/07/2018 | ||
140 | Mehatpur | M/S Kulwant singh sandhu | Const. of OHSR | Sh. Jitin Vasudeva | 2018-07-27 05:32:07-ks.pdf | 2018-11-13 10:41:15-InspectionLetter.jpeg | Approved | View Detail | 27/07/2018 | 07-09-2018 | |
137 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-07-27 03:48:40-InspReqElectricalPanel.pdf | Approved | View Detail | 27/07/2018 | 01-08-2018 | ||
136 | Khanna | 21st centuary enviro infra ltd | Const. of STP (Under AMRUT) | Sh. Gurdeesh Pal Singh | 2018-07-26 07:18:32-Diffuser inspection.pdf | Approved | View Detail | 26/07/2018 | 07-06-2018 | ||
135 | Khanna | 21st centuary enviro infra ltd | Const. of STP (Under AMRUT) | Sh. Gurdeesh Pal Singh | 2018-07-26 07:13:49-PLC Inspection.pdf | Approved | View Detail | 26/07/2018 | 04-07-2018 | ||
134 | Khanna | 21st centuary enviro infra ltd | Const. of STP (Under AMRUT) | Sh. Gurdeesh Pal Singh | 2018-07-26 07:10:20-DECANTER INSPECTION.pdf | Approved | View Detail | 26/07/2018 | 03-06-2018 | ||
133 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-07-26 06:52:05-Letter no. 1067 Inspection call for various type of valves, for 4.5 MLD STP.pdf | Rejected by XEN | View Detail | Inspection offered vide firm letter No. 1067 dated 25.07.2018 is not as per approved DNIT specifications. Returned to the agency | 26/07/2018 | ||
132 | Dera Bassi | Sh. Makhan Lal Jindal Cont. | Providing Sewerage and Construction of MPs | Ms Lata Chauhan | 2018-07-25 05:05:07-Inspection.jpg | 2018-08-28 15:56:01-letter.jpg | Approved | View Detail | 25/07/2018 | 26.07.2018 | |
131 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-07-19 06:32:11-letter no. 1040 Inspection call for various type of valves, for 4.5 MLD STP.pdf | Rejected by XEN | View Detail | Inspection offered by the firm is not as per approved DNIT specifications hence rejected and returned to the firm | 19/07/2018 | ||
130 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2018-07-19 06:19:47-letter no. 1039 Inspection call for various type of valves, for 5 MGD WTP.pdf | Approved | View Detail | 19/07/2018 | 24.07.2018 | ||
129 | Lalru | M/s Oberoi Contruction Corporation | providing and laying SW PIPE sewer and construction of MPS at lalru under urban mission project | Ms Lata Chauhan | 2018-07-18 10:56:50-001.jpg | 2018-08-28 15:52:26-Letter.jpg | Approved | View Detail | 18/07/2018 | 20.07.2018 | |
128 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-07-17 10:06:13-IMG-20180717-WA0063.jpg | Approved | View Detail | 17/07/2018 | 18-07-2018 | ||
127 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-07-17 08:34:34-Sub. Pump Inspection.pdf | Rejected by XEN | View Detail | Sent back to Shapoorji Pallonji pvt. ltd vide this office letter no. 2956 dated 27.7.2018 for compliance | 17/07/2018 | ||
126 | Guruharsahai | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Guruharshai , Arniwala & Abohar. | Sh.Pritpal Singh | 2018-07-17 06:32:08-Man Hole Cover Inspection.pdf | Approved | View Detail | 17/07/2018 | 23-07-2018 | ||
125 | Bassi Pathana | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-07-13 12:44:57-sw Pipe Insp.Bassi pathana.pdf | Approved | View Detail | 13/07/2018 | 18-07-18 | ||
124 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-07-13 12:00:00-SW Pipe Insp. Sirhind.pdf | Approved | View Detail | 13/07/2018 | 18-07-18 | ||
123 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-07-13 11:41:22-Tile Inspection Sirhind.pdf | Approved | View Detail | 13/07/2018 | 18-07-2018 | ||
122 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-07-13 11:37:09- | Rejected by XEN | View Detail | No attachment found | 13/07/2018 | ||
121 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2018-07-12 13:15:15-Letter no. 1014 Inspection call for LT Panels.pdf | Approved | View Detail | 12/07/2018 | 16.07.2018 | ||
120 | Ferozepur | M/S Dhruv Tubewell Engineers | Boring & installing Tubewells ( Under AMRUT) | Sh.Pritpal Singh | 2018-07-11 08:49:45-Dhruv Tubewell Inspection L 11-7-18 001.jpg | Approved | View Detail | 11/07/2018 | 17-07-2018 | ||
119 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-07-10 08:28:18-Outward letter no. 1017 Poly Dosing Pump for, 4.5 MLD STP.pdf | Approved | View Detail | 10/07/2018 | 11-07-2018 | ||
118 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-09 16:27:41-letter no 49.pdf | Approved | View Detail | 09/07/2018 | 12.07.2018 | ||
117 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-09 16:25:08-letter no 48.pdf | Approved | View Detail | 09/07/2018 | 12.07.2018 | ||
116 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-09 16:21:25-letter no 47.pdf | Approved | View Detail | 09/07/2018 | 12.07.2018 | ||
115 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-07 08:17:14-letter 45.pdf | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
114 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-07 08:13:43-letter 44.pdf | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
113 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-07 08:09:31-Letter 43.pdf | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
112 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-07 08:04:25-letter 42.pdf | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
111 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-07 07:57:33-Letter 41.pdf | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
110 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-07-07 07:49:45-letter 40.pdf | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
109 | Rampura Phul | M/S Bansal & Company Bathinda | prov sew scheme at Rampura Phul | Sh. Gurvinder Pal Singh | 2018-07-07 06:29:11-Image.jpg | Approved | View Detail | 07/07/2018 | 09.07.2018 | ||
108 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Gurvinder Pal Singh | 2018-07-06 06:26:14-Outward letter no. 1035 Sluice Gate for, 5 MGD WTP.pdf | Approved | View Detail | 06/07/2018 | 09.07.2018 | ||
107 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-07-06 06:10:34-Outward letter no. 1034 Sluice Gate for, 4.5 MLD STP. & MPS.pdf | Rejected by XEN | View Detail | The work is going on very slow speed and only RCC work of MPS and 25% civil work of STP done by the firm. So at present this material is not required. This material will be required after completion of civil work of MPS and STP. So at present arrangement of this material is only dumping of money. | 06/07/2018 | ||
106 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-07-05 14:33:28-Inspection call of Paver Block 2.jpeg | Approved | View Detail | 05/07/2018 | 23-07-2018 | ||
105 | Sardulgarh | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-07-05 14:30:25-Inspection call of Paver Block 1.jpeg | Approved | View Detail | 05/07/2018 | 23-07-2018 | ||
104 | Lalru | M/s Oberoi Contruction Corporation | providing and laying SW PIPE sewer and construction of MPS at lalru under urban mission project | Ms Lata Chauhan | 2018-07-05 05:31:49-Oberoi.jpg | Approved | View Detail | 05/07/2018 | 05-07-18 | ||
103 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-07-05 00:48:15-InspReqTrans-Nucon.pdf | Approved | View Detail | 05/07/2018 | 05-07-2018 | ||
97 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-06-22 12:05:01-Insp. Letter Pole.pdf | Approved | View Detail | 22/06/2018 | 25.06.2018 | ||
96 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-06-22 10:45:03-Outward letter no. 1013.pdf | Approved | View Detail | 22/06/2018 | 26.06.2018 | ||
95 | Adampur | M/s S.R. Builders & Exporters, Patiala | Const. of MPS | Sh. Jitin Vasudeva | 2018-06-22 10:11:20-Inspection of DI Special material Adampur.pdf | Approved | View Detail | 22/06/2018 | 22-6-2018 | ||
94 | Mansa | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-06-22 03:46:55-Inspection call letter for Paver Block Mansa.JPG | Approved | View Detail | 21/06/2018 | 20-06-2018 | ||
93 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-06-22 03:37:13-insp. call request di k7 pipe mansa.pdf | Approved | View Detail | 21/06/2018 | 25.06.2018 | ||
91 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-06-21 12:17:19-DI pipe & ftiting for OHSR Mansa.pdf | Approved | View Detail | 21/06/2018 | 25.06.2018 | ||
90 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-06-21 09:48:42-001.jpg | Approved | View Detail | 21/06/2018 | 25-06-2018 | ||
89 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-06-21 05:15:25-Pole inspection request Mansa.pdf | Approved | View Detail | 21/06/2018 | 25.06.2018 | ||
88 | Mehatpur | M/s Kulwant Singh Sandhu | Const. of OHSR | Sh. Jitin Vasudeva | 2018-06-21 05:01:39-mehtpur inpection.pdf | Approved | View Detail | 21/06/2018 | 26-06-2018 | ||
87 | Amloh | Sh. Jai Bhushan Malik | provinding laying sewerage work | Sh. Sabjit Singh | 2018-06-20 11:55:09-InspectionInterlockingpavers.pdf | Approved | View Detail | 20/06/2018 | 21-06-2018 | ||
85 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-06-19 11:33:07-Outward_letter_no.1005.pdf | Approved | View Detail | 19/06/2018 | 22-06-2018 | ||
84 | Sangrur | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Sangrur & Dhuri | Sh. Amandeep Singh | 2018-06-19 05:55:16-RCC Pipe Inspection Sangrur.pdf | Approved | View Detail | 19/06/2018 | 10.7.2018 | ||
83 | Moga | M/S GSJ Envo Ltd. | Ext and Aug sew scheme makkhu | Sh. Parul Goyal | 2018-06-18 06:12:24-gsj sw pipe mk 12 .jpg | Approved | View Detail | 18/06/2018 | 19.06.2018 | ||
82 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-06-16 08:44:52-jaitu interlock tile.pdf | Approved | View Detail | 16/06/2018 | 19.06.2018 | ||
81 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-06-16 08:35:42-kotkapura interlock tile.pdf | Approved | View Detail | 16/06/2018 | 19.06.2018 | ||
80 | Banur | M/S Rajan Builders | Providing Water Supply, Sewerage & MPS | Ms Lata Chauhan | 2018-06-15 08:53:22-vent shaft.jpg | Approved | View Detail | 15/06/2018 | 19/06/18 | ||
79 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-06-11 04:14:45-001.jpg | Approved | View Detail | 11/06/2018 | 05-06-2018 | ||
77 | Amloh | Sh. Jai Bhushan Malik | provinding laying sewerage work | Sh. Sabjit Singh | 2018-06-06 11:56:42-INSPECTIONCALLAMLOH.pdf | Approved | View Detail | 06/06/2018 | 21-06-2018 | ||
76 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-06-06 08:10:15-Letter No. 994.pdf | Approved | View Detail | 06/06/2018 | 07-06-2018 | ||
74 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-06-05 09:38:03-Outward letter no. 993.pdf | Rejected by XEN | View Detail | The inspection of material has been referred back due to unapproved make | 05/06/2018 | ||
73 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-06-05 09:13:48-jaitu inspection.jpg | Rejected by XEN | View Detail | inspection duty approved vide letter CES letter no 2076 dated 07.06.2018 | 05/06/2018 | ||
72 | Faridkot | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-06-05 09:10:08-FARIDKOT inspection.jpg | Approved | View Detail | 05/06/2018 | 07-06-18 | ||
71 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-06-05 09:05:48-kotkapura.jpg | Approved | View Detail | 05/06/2018 | 07-06-2018 | ||
70 | Amloh | Sh. Jai Bhushan Malik | provinding laying sewerage work | Sh. Sabjit Singh | 2018-06-05 07:50:50-INSPECTIONCALLAMLOH.pdf | Rejected by XEN | View Detail | Returned back for revision. | 05/06/2018 | ||
69 | Ferozepur | M/s Kulwant Singh Sandhu | construction of OHSR (Under AMRUT) | Sh.Pritpal Singh | 2018-06-04 17:15:11-fzrohsr.pdf | Approved | View Detail | 04/06/2018 | 15-06-2018 | ||
67 | Dera Bassi | Sh. Makhan Lal Jindal Cont. | Providing Sewerage and Construction of MPs | Ms Lata Chauhan | 2018-06-01 07:03:11- | Approved | View Detail | 01/06/2018 | 01-6-2018 | ||
66 | Bassi Pathana | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-05-30 06:33:52-inspection letter paver block at bassi.pdf | Approved | View Detail | 30/05/2018 | 07-06-2018 | ||
65 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-05-24 10:30:55-984.pdf | Approved | View Detail | 24/05/2018 | 01-06.2018 | ||
64 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-05-24 04:51:59-979.pdf | Approved | View Detail | 24/05/2018 | 01-06-2018 | ||
63 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-05-24 03:58:13-InspReqBFV-Kirloskar.pdf | Approved | View Detail | 23/05/2018 | 01-06-2018 | ||
62 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-05-24 02:58:29-001.jpg | Approved | View Detail | 23/05/2018 | 01-06-2018 | ||
61 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-05-23 05:15:41-Inspection GSJ.jpg | Approved | View Detail | 23/05/2018 | 01-06-18 | ||
57 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-05-16 09:10:31-Outward letter no. 973 Dt 16.05.2018 (Regarding Inspection of Screw Pump for Cen | Approved | View Detail | 16/05/2018 | 17-05-2018 | ||
56 | Fazilka | M/S Garga Associates | Providing laying sewerage work & machinery | Sh.Pritpal Singh | 2018-05-15 11:44:15-Inspection letter.jpg | Approved | View Detail | 15/05/2018 | 17-05-18 | ||
55 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-11 10:01:21-Inspection call -Pole Mansa.pdf | Approved | View Detail | 11/05/2018 | 15/05/2018 | ||
54 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-11 06:45:47-Paver Block - inspection (Mansa & Budhlada).pdf | Approved | View Detail | 11/05/2018 | 15-05-2018 | ||
53 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-05-11 06:43:03-EOT CRANE.jpg | Approved | View Detail | 11/05/2018 | 15-05-18 | ||
52 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-05-11 06:40:07-EOT CRANE.jpg | Approved | View Detail | 11/05/2018 | 15-05-18 | ||
51 | Jaitu | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-05-11 06:29:49-jash.jpg | Approved | View Detail | 11/05/2018 | 15-05-18 | ||
50 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-05-11 06:23:14-jash.jpg | Approved | View Detail | 11/05/2018 | 15-05-18 | ||
49 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-11 06:05:17-267 Cum Pump.pdf | Approved | View Detail | 11/05/2018 | 15/05/2018 | ||
48 | Kotkapura | M/s. Shapoorji Pallonji Co. Ltd | Cluster of Faridkot, Jaitu & Kotkapura | Sh. Parul Goyal | 2018-05-11 06:01:57-Inspection Call for Interlock Paver Block Tiling at Kotkapura Town.pdf | Approved | View Detail | 11/05/2018 | 15-05-18 | ||
47 | Sardulgarh | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-11 05:59:03-173 Cum Pump.pdf | Approved | View Detail | 11/05/2018 | 15/05/2018 | ||
46 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-05-11 03:29:22-ReqForInsp-GritMech-Voltas.pdf | Approved | View Detail | 10/05/2018 | 11-05-2018 | ||
41 | Budhlada | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-10 07:15:07-Letter no.466 dt.10.05.18.jpeg | Approved | View Detail | 10/05/2018 | 15-05-2018 | ||
39 | Boha | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-09 09:55:20-Inspection request Pump Mansa.pdf | Approved | View Detail | 09/05/2018 | 15/05/2018 | ||
38 | Sardulgarh | Gannon Drunkenly (GDCL) | Cluster Barretta, Bhikhi, Mansa , Boha , Sardulgarh, Budhalada | Sh. S.S. Dhilon | 2018-05-09 09:48:29- | Approved | View Detail | 09/05/2018 | 15-05-2018 | ||
37 | Nawanshahr | Sh. Kuldip Singh Contractor, Chandigarh | Providing Sewerage works (Under Urban Mission) | Sh. Ashish Rai | 2018-05-09 02:36:18-d4dbD3yaYBQEW3V2PN71Pgr9.jpg | Approved | View Detail | 08/05/2018 | 14-5-2018 | ||
36 | Kiratpur Sahib | Sh. Parveet Singh Contractor, Mohali | provinding laying sewerage work & const. of MPS | Sh. Rahul Kaushal | 2018-05-09 02:06:24-T7bb6Mg3bYdDFALUYBFSX5d3.jpg | Approved | View Detail | 08/05/2018 | 11-05-2018 | ||
35 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-05-08 09:50:57-800 dia - sirhind.pdf | Approved | View Detail | 08/05/2018 | 11-05-2018 | ||
34 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-05-08 09:38:52-Paver -sirhind 2L.pdf | Approved | View Detail | 08/05/2018 | 11-05-2018 | ||
33 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-05-08 09:10:11-Paver Blocks 2L - sirhind.pdf | Approved | View Detail | 08/05/2018 | 11-05-2018 | ||
32 | Sirhind | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-05-08 09:04:58-Tiles 5L -sirhind.pdf | Approved | View Detail | 08/05/2018 | 11-05-2018 | ||
31 | Bassi Pathana | Gannon Drunkenly (GDCL) | Cluster of Bassi Pathana & Sirhind | Sh. Sabjit Singh | 2018-05-08 08:34:56-paver block-Bassi.pdf | Approved | View Detail | 08/05/2018 | 11-05-2018 | ||
29 | Abohar | M/s. Shapoorji Pallonji Co. Ltd | Providing sewerage work | Sh.Pritpal Singh | 2018-05-08 07:08:30- | Approved | View Detail | 08/05/2018 | 10/05/18 | ||
26 | Nabha | Sh. Kuldip Singh Contractor, Chandigarh | provinding laying sewerage work | Ms Lata Chauhan | 2018-05-08 01:54:14-tFMFWeBX7X6TJ6Y6dDBr6CMR.jpg | Approved | View Detail | 07/05/2018 | 30-4-2018 | ||
25 | Bathinda | M/s Triveni Engineering & Industries Pvt. Ltd | Cluster of Bathinda Town | Sh. Ashwani Kumar | 2018-05-07 11:15:21-967.pdf | Approved | View Detail | 07/05/2018 | 07-05-2018 | ||
22 | Ferozepur | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-05-04 08:37:08-2 001(1).jpg | Approved | View Detail | 04/05/2018 | 26/4/18 | |||
21 | Ferozepur | M/S GSJ Envo Ltd. | Composite work of Ferozepur, Talwandi bhai , Dharmkot, Makhu | Sh.Pritpal Singh | 2018-05-04 08:12:33-1 001.jpg | Approved | View Detail | 04/05/2018 | 26/4/18 | ||
20 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-05-03 06:06:03-LetterInsp_Screen.pdf | Approved | View Detail | 03/05/2018 | 08-05-2018 | ||
18 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-05-03 05:58:13-Letter_InspCentrifuge.pdf | Approved | View Detail | 03/05/2018 | 08-05-2018 | ||
17 | Nakodar | M/s Jai Maa Engineers & Contractors | Const. of MPS & Rising Main | Sh. Jitin Vasudeva | 2018-05-02 11:25:44-horizontal pumps.jpg | Approved | View Detail | 02/05/2018 | 08-05-2018 | ||
16 | Nakodar | M/s Jai Maa Engineers & Contractors | Const. of MPS & Rising Main | Sh. Jitin Vasudeva | 2018-05-02 11:12:23-sluicve gate.jpg | Approved | View Detail | 02/05/2018 | 08-05-2018 | ||
15 | Nakodar | M/s Jai Maa Engineers & Contractors | Const. of MPS & Rising Main | Sh. Jitin Vasudeva | 2018-05-02 11:08:49-sluicve gate.jpg | Approved | View Detail | 02/05/2018 | 08-05-2018 | ||
14 | Mehatpur | M/s R.G. Industries, Jalandhar | Provindg laying water supply works | Sh. Jitin Vasudeva | 2018-05-02 10:52:00-RG Industries.pdf | Approved | View Detail | 02/05/2018 | 8-5-18 | ||
13 | Morinda | M/s Anand Associates, Chandigarh | Const. of STP | Sh. Rahul Kaushal | 2018-04-30 05:46:24-InspectionCallReq-Gates.pdf | Approved | View Detail | 30/04/2018 | 08-05-2018 | ||
11 | Morinda | M/s J.P. Sons, Jalandhar | Boring & intallation of Tubewell | Sh. Rahul Kaushal | 2018-04-27 04:07:52-Letter (1).jpg | Approved | View Detail | 27/04/2018 | 02-05-2018 |