1 |
2020-12-05 00:00:00 Comment: Proposed site for laying of I/L tiles. 0%
|
2021-02-11 00:00:00 Comment: No inspection note regarding RCC pipes provided by the department.
It is found after the opening the two manhole slabs that RCC pipes are not laid with
sockets facing against direction of flow.
40%
|
2021-04-19 00:00:00 Comment: The thickness of bedding sand and lean concrete under 60mm interlocking tiles checked
at 3 points from Anaj Mandi wall to Tubewell, opp Khalsa trading company & opp Billa
Dwaia wala , the bedding sa 80%
|
Comment: |