1 |
2020-12-05 00:00:00 Comment: Proposed site for laying of I/L tiles & Construction of R/gullies. 0%
|
2021-02-11 00:00:00 Comment: The thickness of PCC was checked in street opposite Gurmail singh house and found as
30mm instead of 100mm. The work is under specifications.
The PCC should be re-laid as per specifications. Nec 40%
|
2021-04-19 00:00:00 Comment: The thickness of PCC was checked in street opposite Gurmail singh house and
found as 30mm instead of 100mm. The work is under specifications.
The PCC should be re-laid as per specifications. Nec 80%
|
Comment: |