2020-12-18 00:00:00 Comment: Proposed site for beautification of entry points. 0%
|
2021-02-10 00:00:00 Comment: Necessary credit for material retrieved should be given to the work.
The lead plan showing the disposal site of malba after dismantling of existing paving should be provided.
Inspection note 30%
|
2021-10-01 00:00:00 Comment: At the time of visit, no work was in progress at site.
For beautifications of Triangles/Entry point near traffic lights of phase I & 6, pedestal structure was being
built, 270mm wide and 15m 70%
|