1 |
2020-12-10 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-02-03 00:00:00 Comment: The CC 1:8:16 laid at site with hand mix instead of mechanical mix.
Near starting of street the thickness of bedding sand & lean concrete under I/L 60mm tiles were checked and the bedding sand 30mm 45%
|
2021-09-30 00:00:00 Comment: The excess fine sand spread over the I/L tiles for filling the joints needs to be
broomed properly.
The filling sand in the joints of I/L tiles was not proper. It needs to be rectified.
The 70%
|
Comment: |