2020-12-11 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-09-30 00:00:00 Comment: • The depth of RG chambers was observed less than the standard measurements as per CSR item no 29.92.
• Plaster on wall of R/G chamber was not done properly as at some locations R/G found withou 30%
|
2021-09-30 00:00:00 Comment: Near Singla R.O. Repair Centre & New Gouri Shankar AC Enterprises the thickness
of bedding sand and base concrete checked at 2 points and found to be 25mm &
30mm(Sand), 80mm & 85mm(Base concrete) a 75%
|
Comment: |