2020-12-11 00:00:00 Comment: Proposed site for P/L of I/L tiles and CC flooring. 0%
|
2021-09-30 00:00:00 Comment: • At random the thickness of lean concrete checked at three points of the site and found in order.
• The lean concrete laid at site observed segregated and not properly compacted. It needs to be 45%
|
2021-09-30 00:00:00 Comment: The quality of CC flooring is not satisfactory as the finishing of the surface is not
done properly.
Longitudinal and transverse joints should be provided as per the specifications.
At r 70%
|