1 |
2021-01-07 00:00:00 Comment: Proposed site for P/L of CC flooring. 0%
|
2021-02-10 00:00:00 Comment: Near Chahal Nagar, the thickness of CC was checked & found as per estimate.
No test reports i.e cube test, Slump test, bricks, coarse sand, cement, Brick, stone
ballast at site was shown to TPIA 45%
|
2021-08-02 00:00:00 Comment: 4” CC slab flooring has been done at site, which is as per provisions made in the estimate.
No copy of Mix –Design M-30 duly approved by EE, Delivery sheet of RMC , cube test ,Slump test etc. of 80%
|
Comment: |