1 |
2020-12-22 00:00:00 Comment: At the time of visit, Near shop of Doaba chicken lean concrete found laid but
could not be checked due to unavailability of labour. AME/JE Should check the
thickness of lean concrete at some points 10%
|
2021-01-15 00:00:00 Comment: Near Gurudwara the thickness of RMC checked & found 3.8”instead of 4”. SDE/JE should check & verify the thickness at their own level before making Suitable payment.
No copy of Mix –Design M 30%
|
2021-09-30 00:00:00 Comment: Thickness of CC was checked at the site and was found satisfactory.
The time limit for the completion of work has elapsed, but the work has not been
completed on site.
No document regarding exten 70%
|
Comment: |