2022-09-26 00:00:00 Comment: • Near welding shop, the foundation of the pole was checked and found 23.5”X23.5”. against 24”X24”.
• Test report of material i.e. Cement, fine / coarse aggregate and other electrical ite 100%
|
2021-01-30 00:00:00 Comment: The cable in DWC pipe should be laid at depth of 1 metre.
In estimate the LED light 72w was taken but at site the 70W LED light was fixed, justification regarding changing of specification should 40%
|
2021-03-19 00:00:00 Comment: 1) Concrete foundation block was found as per provision of 600mm X 600mm.
2) Honeycombing was observed in foundation block of poles.
3) Octagonal Pole was not fixed properly on the foundation. It mi 70%
|
2022-09-26 00:00:00
Comment: •Near welding shop, the foundation of the pole was checked and found 23.5”X23.5”. against 24”X24”.
•Test report of material i.e. Cement, fine / coarse aggregate and other electrical items100% |