1 |
2022-09-26 00:00:00 Comment: • I/L tiles were found settled in approx. area of 5’X5’ at the link near railway station. It should be rectified before the final payment is made to the contractor.
• Near Dyal Catters , the 100%
|
2021-01-30 00:00:00 Comment: Suitable caution boards etc, was not placed at site of work.
Some R/G chambers being constructed at site were not as per specifications i.e CSR item 29.92. The size of R/G chamber was not as per 45%
|
2021-03-19 00:00:00 Comment: 1) At random the thickness of bedding sand under I/L tiles flooring near Shri Balaji Medicine Centre, Prabh Dayal Rakesh Kumar Shop and in front of Hospital checked and found in order.
2) During ins 70%
|
2022-09-26 00:00:00
Comment: •I/L tiles were found settled in approx. area of 5’X5’ at the link near railway station. It should be rectified before the final payment is made to the contractor.
•Near Dyal Catters , the be100% |