1 |
2020-11-06 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-10-01 00:00:00 Comment: At the time of visit the work was of dismantling of old cc & levelling of surface was in progress at site.
Department must ensure the work is being executed as per specifications. 30%
|
2021-03-09 00:00:00 Comment: The thickness of bedding sand was randomly checked under 60 mm thick interlocking tiles at two points and found 25 mm and 60 mm. Concerned Junior Engineer at site was instructed to make the payment as 80%
|
Comment: |