1 |
2020-11-06 00:00:00 Comment: Proposed site for development of streets. 0%
|
2021-10-01 00:00:00 Comment: „h The sand bedding under I/L tiles was checked in street just opposite to Petrol pump and found 10 mm instead of 40 mm. Necessary recovery on account of providing less quantity shall be made from t 30%
|
2021-03-09 00:00:00 Comment: The thickness of bedding sand was randomly checked under 60 mm thick interlocking tiles at two points and found 25 mm and 35 mm. The thickness of bedding points needs to recheck by the departmental le 75%
|
Comment: |