1 |
2020-11-25 00:00:00 Comment: Proposed site for laying of I/L tiles. 0%
|
2021-01-16 00:00:00 Comment: It is randomly found that from the shuttering store of Gur kirat to Dashmesh
RCC pipes are not laid with sockets facing against direction of flow. It should
be checked at some more places by Enginee 30%
|
2022-05-14 00:00:00 Comment: • PVC steps fixed inside the manhole and thickness of CC slab of manhole could not be checked at site due to non-availability of required labor and tools.
• Department must ensure that the paymen 80%
|
Comment: |