1 |
2020-12-24 00:00:00 Comment: No design statement provided.
No L-section, x-sections of earth work excavation provided.
No lead plan/disposal site for disposal of surplus earth/malba provided.
RCC pipe should be con 0%
|
2021-02-08 00:00:00 Comment: In front of Plot no. 50 at godown area the cover of road gully found damaged and road gully not plastered from inside. It needs to be rectified.
At random the size of road gully checked and found 30%
|
2022-03-15 00:00:00 Comment: At random, the thickness of bedding sand and lean concrete under 80mm interlocking tiles near Cipla
Limited godown checked and found bedding sand 45 mm & lean concrete 70 mm. Near the same
locatio 80%
|
Comment: |