2020-12-10 00:00:00 Comment: Proposed site for P/L of I/L tiles, storm water and other works. 2%
|
2021-03-10 00:00:00 Comment: Fine sand was used under I/L tiles instead of coarse sand so sample of bedding sand were
collected from different sites in the presence of ULB officials along with Contractor. The sample
sent to NAB 40%
|
2021-07-07 00:00:00 Comment: Samples of bedding sand were collected in the presence of ULB officials along with Contractor.
The sample was sent to a NABL accredited lab for its testing. The tests report of bedding
sand was rece 75%
|