1 |
2020-12-10 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-03-10 00:00:00 Comment: Fine sand was used under I/L tiles instead of coarse sand so sample of bedding sand were
collected from different sites in the presence of ULB officials along with Contractor. The
sample sent to NAB 30%
|
2021-07-07 00:00:00 Comment: Surplus sand was lying on the top surface of the tile flooring which should be removed after
brooming.
As per the list, in work no. 27 (18.62 lakh) the thickness of bedding sand was randomly
ch 70%
|