1 |
Comment:
|
2021-01-21 00:00:00 Comment: At the time of visit, M.S pipe 120mm o/d (vertical post) was erected for roof truss.
No structure design/drawings of the shed provided to TPI team.
The muff of electric poles was constructed 30%
|
2021-10-05 00:00:00 Comment: • Generally approved structural drawings duly vetted by an Engineering college of the steel trusses and columns to be constructed were not provided to TPIA team.
• According to the estimate, work 70%
|
2023-02-24 00:00:00
Comment: •In front of canteen length of shed was measured and found as per paid in bill i.e. 103ft.
•Payment should be done as per actual work executed at site.
•No structure design/drawings of the sh100% |