2020-12-15 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
Comment:
|
2021-02-06 00:00:00 Comment: • Front of H/o Shingara Singhand front of Prav Handloom thickness of bedding sand and lean concrete under I/L tiles randomly checked and observed as bedding sand 35mm and 40mm respectively & Lean c 85%
|
2023-01-05 00:00:00
Comment: Length of the Sanjeev Kumar street was checked at site and found 330’ against 351’ as per the completion plan provided by the department.
•The thickness of bedding sand & lean concrete found le100% |