2020-12-08 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-02-04 00:00:00 Comment: Near Kulrian Road, the thickness of base Concrete was checked & found 90mm instead of 100mm, which is 10mm less than required 45%
|
2021-09-30 00:00:00 Comment: Near the House of Shri Pargat Chohan the thickness of bedding sand and
base concrete under I/L 60mm tiles were checked and found the bedding
sand 20mm against 40mm and base lean concrete found in or 70%
|