2020-12-14 00:00:00 Comment: Work not started. Nil
|
2021-10-01 00:00:00 Comment: Near Electric Pole No.PDB10-F14L/005 & PDB10-F02L/223 the thickness of
bedding sand and base concrete checked and found in order i.e., 40mm
(Sand)+100mm (Base concrete) as per specification.
40%
|
2023-01-07 00:00:00 Comment: At the time of visit work was in progress.
The thickness of bedding sand and base concrete under I/L 60mm tiles was checked
at 2 points near backside of Raghvir house and found - the bedding sand 3 75%
|