1 |
2020-11-27 00:00:00 Comment: Proposed site for P/F of 60 MM i/L tiles. 0%
|
2021-06-24 00:00:00 Comment: During the site visit, no work was in progress & it was observed that lean concrete 1:8:16 laid at site was manually mixed as there was no mechanical mixture used at site, lean concrete 1:8:16 should 30
|
2022-12-07 00:00:00 Comment: At the time of visit work was in progress.
It was observed that fine sand is being used below the I/L tile instead of coarse sand. It
needs to be rectified.
The thickness of bedding sand and base 80%
|
Comment: |