1 |
2020-11-27 00:00:00 Comment: Proposed site for P/F of 60 MM I/L tiles. 0%
|
2021-01-20 00:00:00 Comment: At random the thickness of base concrete under I/L tiles flooring near H R Health Care Centre checked and found 50mm against of 100mm.
Sub-standard work should be rejected. Department must ensure 30%
|
2021-02-25 00:00:00 Comment: The sand filling in joints of I/L tiles laid was found improper.
The thickness of bedding sand + I/L tiles was checked near KRB school street on Cheema
road was found 100 mm which is as per es 70%
|