1 |
2020-11-27 00:00:00 Comment: Proposed site for P/F of 60 MM I/L tiles. 0%
|
2021-02-25 00:00:00 Comment: At the corner of road near house of goga palta to sheru dairy end locking of I/L tiles laid
was not proper.
At random, the thickness of bedding sand + lean concrete + I/L tiles were checked 45%
|
2021-12-07 00:00:00 Comment: It was observed that Stone Dust sand is being used below the I/L tile instead of coarse
sand.
The thickness of bedding sand and base concrete under I/L 60mm tiles was checked at 2
points near 80%
|