1 |
2020-11-27 00:00:00 Comment: Proposed site for P/F of 60 MM I/L tiles. 0%
|
2021-01-20 00:00:00 Comment: At random the thickness of bedding sand under I/L tiles flooring near B-4/55 checked and found proper.
No test report of material i.e. fine and coarse aggregate and I/L tiles etc, was provided by 40%
|
2022-12-07 00:00:00 Comment: At the time of visit work was in progress.
Stone dust was used as bedding sand instead of coarse sand .The thickness of bedding
sand and base concrete under I/L 80mm tiles was checked at 2 poin 80%
|
Comment: |