1 |
2020-12-24 00:00:00 Comment: Proposed site for const. of footpath, Retaining wall and Green Belt. 5%
|
2021-01-09 00:00:00 Comment: The reinforcement of retaining wall was not tied properly. It should be rectified.
The width of the retaining wall is found as 150mm as per requirement.
Honey combing was observed on the con 45%
|
2021-05-28 00:00:00 Comment: 1) Mild Steel bars for retaining wall structure were being used at site but copy of ISI license issued to the manufacturer was not shown to the WAPCOS team.
2) During site visit, detailed drawing of 70%
|
Comment: |