2020-12-24 00:00:00Comment: Proposed site for Construction of Drain. 0%
2021-10-01 00:00:00Comment: The drain surface was not properly plastered. Plastering of drain must be
ensured as per specifications.
For efficient drainage, proper slope should be provided as per specifications.
The u30%