1 |
2020-12-24 00:00:00 Comment: Proposed site for laying of High Mast Lights. 0%
|
2021-01-09 00:00:00 Comment: Proper specifications of High mast poles used was not provided by the department.
No specification of panel box installed at site was provided by the department.
Height of pole was checked a 30%
|
2021-10-01 00:00:00 Comment: As per CSR 33.31A, the outer surface of the plinth of muff to be finished with pure cement,
proper finishing not provided at site.
No inspection note of electric poles inspected by senior office 70%
|
Comment: |