1 |
2020-12-24 00:00:00 Comment: Proposed site for laying of LED lights. 0%
|
2021-01-09 00:00:00 Comment: No details of make of LED lights used at site as per list of approved make was provided by the engineer in charge.
Specification of bracket was not provided by the department.
It was observe 30%
|
2021-10-01 00:00:00 Comment: It was observed during the visit the brackets used to hang LED lights on RCC poles were
rusted and pf second quality.
Department must ensure the quality of material as per specifications. Sub-st 70%
|
Comment: |