2021-01-15 00:00:00 Comment: The hand mixture CC 1:8:16 laying at site instead of mechanical mixture.
ï‚· Starting of street No. 01 the thickness of bedding sand and base concrete under I/L tiles were checked and found the beddi 40%
|
2021-10-01 00:00:00 Comment: „h The usable dismantled material be accounted for as per departmental norms in a
transparent manner and the non-usable dismantled material (Malba) be disposed at
the nearest appropriate site.
ï‚ 70%
|