2020-10-22 00:00:00 Comment: Proposed site for laying of CC flooring and construction of drain Type-1. 10%
|
Comment:
|
2021-01-19 00:00:00 Comment: Interlocking tiles found depressed at different places of street, it should be
rectified before making any payment of the contract agency.
Brooming on the surface of tiles is yet to be done 80%
|
2022-12-24 00:00:00
Comment: •Length of both branch streets checked and found as per paid in MB.
•The thickness of bedding sand and lean concrete laid under interlocking tiles (60mm ISI marked) was randomly checked near the 100% |