2021-10-02 00:00:00 Comment: • At random, near house of Ravinder Singh & Karmjit kaur the thickness of lean concrete checked at three points and found as 100 mm which is as per estimate.
• Bedding sand in these places checke 30%
|
2022-02-08 00:00:00 Comment: In front & besides of H/o Ekbal Singh, the thickness of bedding sand and lean concrete,
laid under interlocking tiles was randomly checked at two different locations and foundthickness of (I/L Tile 85%
|
2022-12-24 00:00:00
Comment: •Completion plan provided by the department & not proper site location was men-tioned. Also, no length of street was shown at completion plan.
Street- near Railway crossing: -
•Length of street 100% |