1 |
2021-01-19 00:00:00 Comment: Inspection note for electrical material used at site should be prepared and
submitted to TPI team during next visit.
0
|
2022-05-19 00:00:00 Comment: • As informed by the JE, 90W “CROMPTON” LED lights were provided under this contract, but no copy of test report of luminaries was provided to TPIA team.
• LED lights were installed with pole 45%
|
2021-10-02 00:00:00 Comment: Near clinic of DR. Santokh Singh, Meritorious Residential School and Bajwa Tile
Mart, Concrete Pedestal were found of poor finishing And HDPE pipe missing
at some places. It needs to be got rectifie 85%
|
2022-12-24 00:00:00
Comment: •As per vetted estimate installation work of LED lights was sanctioned from SD Col-lege to Mandi Chowk. As informed by concerned JE, installation work of 90W ‘CROMPTON’ make LED light with 9mete100% |