2021-01-13 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%
|
2021-02-10 00:00:00 Comment: • At the time of visit the work of sand filling in joint of I/L tiles laid was in progress at site.
• Undulations and depressed tiles should be rectified.
• No display showing name of work, 45%
|
2021-05-21 00:00:00 Comment: 1) Thickness of the bedding sand under interlocking tiles was randomly checked at
various points near Mahla Road to H/O Mohinder Singh Street, 05meter ahead from starting of street, and found 15mm a 80%
|