1 |
2021-01-13 00:00:00 Comment: Proposed site for P/L of I/L tiles. 0%w
|
2021-02-10 00:00:00 Comment: • At the time of visit the work was in progress.
• The sand filling in joints of I/L tiles laid was found improper.
• At random, thickness of bedding sand checked under 80 MM I/L tiles near 40%
|
2021-05-21 00:00:00 Comment: 1) The thickness of bedding sand was checked Near Bittu Cold Drink Shop and Transformer and was found in order, base concrete under 80mm I/L tiles was
randomly checked, the thickness of bedding sand 80%
|
Comment: |