1 |
2020-12-31 00:00:00 Comment: proposed site for laying of I/L tiles. 0%
|
2021-05-25 00:00:00 Comment: Providing and Laying Interlocking Paver 60mm thick in link street Ashok kumarwali:-
1) The thickness of bedding sand and base concrete checked at 2 points Near link street Ashok kumar wali, 05 meter 35%
|
2021-08-27 00:00:00 Comment: The usable dismantled material should be accounted for as per departmental
norms in a transparent manner and the non-usable dismantled material (Malba) should be disposed at the nearest appropriate s 70
|
Comment: |