1 |
2020-12-31 00:00:00 Comment: Proposed site for P/L of 60 MM I/L tiles. 0%
|
2021-02-09 00:00:00 Comment: The usable dismantled material be accounted for as per departmental norms in a transparent manner and the non usable dismantled material (Malba) be disposed at the nearest appropriate site.
The d 40%
|
2021-05-25 00:00:00 Comment: Resoling interlocking Paver near Mele Tole Wali Gali Prem Nagar, ward no.12:-
1) The quality of work observed very poor.
2) At some portion Drain cover found damaged. It needs to be rectified.
3) A 70%
|
Comment: |