1 |
2020-12-31 00:00:00 Comment: Proposed site for P/L of 80 MM I/L tiles. 0%
|
2021-08-27 00:00:00 Comment: The thickness of bedding sand and base concrete was checked at 2 points Near India Engineering Work Shop and found in order i.e 40mm (Sand) + 100mm (Base concrete).
JE/AME should check thickness & q 30
|
2022-03-08 00:00:00 Comment: At the time of visit work was in progress.
Near A.K. Dhaba, the thickness of bedding sand and base concrete was checked at 2 points where bedding sand found in order but base concrete found 80mm whic 80
|
Comment: |