1 |
2021-10-01 00:00:00 Comment: The material to be used at site, be tested as per norms and Test Reports be kept in record and shown to the audit team at the next visit.
Slope of drain to be kept proper for efficient drainage. 0%
|
2022-01-03 00:00:00 Comment: At the time of visit work was in progress, but the speed of execution of work at site is very slow.
The drain surface was not properly plastered. Plastering of drain must be ensured as per specificat 40
|
2023-03-13 00:00:00 Comment: •The tenders were invited through E-Tender notice with the date of opening of technical bid as 30.07.2020. Through this tender notice only 1 work mentioned at serial No. 10 of the tender notice was 80%
|