1 |
2021-09-30 00:00:00 Comment: No Caution board & Night signals were displayed on work site & no caution tapes
barricading was done. For proper drainage camber should be provided as per specification 5%
|
2021-10-01 00:00:00 Comment: ISI marked Interlocking tiles being used at site & were of correct thickness and size.
The sand filling in joints of I/L tiles laid was found insufficient.
Test reports for the materials bei 30%
|
2021-10-01 00:00:00 Comment: The drain surface was not properly plastered. Plastering of drain must be ensured as
per specifications.
For proper drainage, slope should be provided as per specifications.
Thickness of be 70%
|
Comment: |