1 |
2020-11-10 00:00:00 Comment: Proposed site for Providing\laying of I/L tiles. 0%
|
2021-01-14 00:00:00 Comment: At random the thickness of base concrete was checked near kesari store & jagat general store and found 50mm & 80mm against of 100mm. End locking of I/L tiles laid was not done with CC along the edge o 45%
|
2021-09-25 00:00:00 Comment: In front of Bhole di Hatti, the thickness of bedding sand and lean concrete under 80mm I/L tiles was checked and found in order.
At site, some tiles were found damaged at the corner. These need to be 80
|
Comment: |