1 |
2020-11-10 00:00:00 Comment: The Katcha berm exists at the proposed site of work.
For earth filling having depth more than 1’ proper L-sections & X-sections
showing the existing NGLs & final proposed formation level of ea 0%
|
2021-01-14 00:00:00 Comment: The thickness of bedding sand under I/L tiles flooring was checked near Sons raise steel shuttering store and found 00mm against of 40mm and thickness of base concrete was checked and found 80mm again 30%
|
2021-04-22 00:00:00 Comment: 1) Near Bajaj Automobile Agency and Gaushal the thickness of bedding sand and base concrete checked and found to be 38mm & 40mm(Sand), 80mm & 85mm(Base concrete) against the provision of 40mm(Sand) & 70%
|
Comment: |