2020-11-10 00:00:00 Comment: At the time of visit the work was not started.
For efficient flow of water proper gradient should be provided. 0%
|
2021-01-14 00:00:00 Comment: At site PVC pipes were used instead of RCC NP2 200mm Dia pipe. It needs to be rectified. Finishing and benching of the drain should be ensured properly. 30%
|
2021-09-25 00:00:00 Comment: Near H.No. B-03/723 the cover of RG chamber was found damaged. Its needs to be replaced.
All the RG chambers constructed at site were clogged as they were filled with mud and malba, which has caused 80%
|