2020-12-24 00:00:00 Comment: • At the time of visit work was not started at site.
• The existing street is paved with cement concrete and found damaged as well as eroded in some portions. 0%
|
Comment:
|
2021-06-12 00:00:00 Comment: No new work was ongoing during the time of visit at site.
Thickness of bedding sand and lean concrete laid beneath the I/L tiles could not
be checked at site due to unavailability of labour and 80
|
2022-05-14 00:00:00
Comment: • As per completion report/ certificate the work stands completed on 14.06.2012.
• The length of I/L tile paving marked as 105’ 9” on completion plan checked and same including CC end locking100% |