2020-10-14 00:00:00 Comment: The credit for the useable interlocking tiles retrieved after dismantling of existing I/L tiles should be given to work as per local body guidelines.
For earth filling having depth more than 1’ 0%
|
2020-11-09 00:00:00 Comment: Thickness of bedding sand was randomly checked at three points i.e. found 15mm to 20mm instead of 40mm. The thickness i.e. 15mm is not as per IRC SP:63-2004, so the work in this portion needs to be re 30%
|
2021-03-19 00:00:00 Comment: At some places I/L tiles were depressed and undulations was observed.
18
3. Thickness of wet mix & bedding sand could not be checked due to non
availability of labour & required T&P.
4. RG chamber 70%
|
Comment: |