1 |
2021-05-17 00:00:00 Comment: The proper record of compaction should be maintained & shown to WAPCOS team
during the next visit.
For proper drainage the longitudinal slope and camber should be provided as per
PWD specificat 0%
|
2021-06-19 00:00:00 Comment: Fine sand in the joints of I/L tiles should be filled for proper locking.
It was observed at site, that at some points I/L tiles paved surface was above the
level of adjacent metalled road which 35%
|
2021-07-27 00:00:00 Comment: At the time of visit, work was in progress at site.
The thickness of bedding sand and base concrete was checked in front of Damesh Rice Mills & Jagdish Rice Mills and found to be 25mm & 25mm (Sand), 75
|
Comment: |