2021-10-03 00:00:00 Comment: Work not started yet 0
|
2022-03-24 00:00:00 Comment: The dimensions of road gullies were randomly checked near Sohan dhaba wala and
observed as 610mx470x355mm, the depth was not as per CSR item no. 29.92. The rate forpayments of road gullies should be 50%
|
2022-12-09 00:00:00 Comment: •Top surface of RMC was found eroded. This needs to be rectified.
•Thin line cracks were observed on top surface of CC at some places. This needs to be rectified.
•pug marks was observed at so 85%
|
Comment: |