2021-01-18 00:00:00 Comment: • No work was in progress at the time of inspection by TPA team.
• Some material like electric poles and its fittings were stacked at site.
• Specifications of pole and material used at site s 5%
|
2021-10-01 00:00:00 Comment: RCC Foundations of Electric poles has been laid and pillars of size 4.5 feet x3
feet has been built at the site.
No copy of Structural drawings , vetted estimate copy & Specifications
approved b 40%
|
2021-12-14 00:00:00 Comment: One no. High Mast lighting pole of make Utkarsh of 16mtr. Length with 8 no.
of lights of surya make 250 watt. was erected near Soni gas agency.
The size of CC foundation of Pole was chec 70%
|