2021-01-18 00:00:00 Comment: • At the time of visit, excavation work on sides was in progress where I/L tiles are to be paved.
• Sub-base should be compacted properly before start of proposed work.
• Proper record of comp 5%
|
2021-10-01 00:00:00 Comment: At the time of visit the work of laying of 60 mm thick I/L tiles was in progress.
Thickness of bedding sand and lean concrete was checked at site and found in
order.
No test report of Int 30%
|
2021-12-14 00:00:00 Comment: The thickness of bedding sand & lean concrete (1:8:16) under 60mm I/tiles was
randomly checked near Arra , thickness of bedding sand plus lean concrete was
observed 125mm instead of 140mm,the 70%
|
Comment: |