2021-01-15 00:00:00 Comment: Thickness of slab was checked at near gali SHO found as 150mm. and opposite of Babu Cement Store it was found as 100mm.
Poor workmanship work should be rejected as honey combing was seen on overa 10%
|
2021-10-02 00:00:00 Comment: • Thickness of drain wall was checked near turning point of drain & front of Mandir found 160mm and 152mm. Hence as an average found in order.
• A crack was found at joint from 40 feet distant fr 45%
|
2021-11-27 00:00:00 Comment: • Most of the portion of Drain was found filled up with malba and garbage, if construction material is not cleaned by the Contractor then it can cause the obstruction to the flow of sewage. It shoul 80%
|